亚洲 高清 成人 动漫-俺去俺来也在线www色官网-日本内射精品一区二区视频-波多野结衣无内裤护士

AMI System Solution
AMI System Solution


Functions
Administration

? Meter Administration
? Concentrator Administration
? Monitoring of System Components Replacement History
? Monitoring of Command and Parameter History of System Components
? Defining of Roles and Users/User Groups
? Access Control to System Components and AMR Centre
? Administration of reporting functions of AMI Centre
? Regular Automatic Backup of All Data At the Desired Time

Data Reading/Collection and Archiving

? Reading of Individual Concentrator/meter

? Reading of the Group of Concentrators/Meters

? Automated Reading According to the Sequence

? Reading On Request

? Periodical Reading on Request

? Special Reading on Request

? Data collected automatically according to the sequence set in advance include the following

  ? Daily Register Values

  ? Meter States

  ? Electricity Quality Log

  ? Event Log

  ? Load Profile

  ? Hourly Register Values

  ? State of Monthly Accounting Registers

  ? Time and Date


? Data collected from the meter on request including:

  ? Effective Voltage Values Per Phases At the Moment of Reading

  ? Effective Current Values Per Phases At the Moment of Reading

  ? Current Power–(Load Power At the Moment of Reading)

  ? Tariff Programmer

  ? Integration Period for 15-Minute Maximum Power

  ? Consumption Management Parameters

  ? Parameters for Voltage Thresholds Within Electricity Quality Log

  ? Parameters or Time Intervals of Profiles

  ? Parameters for Registers Within Profiles

  ? Parameters Related to the Presentation On Meter Display

  ? Archive States of Accounting Registers

  ? Current State of Bi-stabile Switch

  ? Meter Software Version

  ? Factory Number and Type of Meter


? Data read according to the sequence from the concentrator including:

  ? Statistics of Communication / Emergency and Regular Reports


? Data read from the concentrator upon the request including:

  ? Concentrator Data Archive

  ? Reading Programmes/Sequences

  ? Management/Parameterisation Programmes/Sequences

  ? Programmes/Sequences Execution Priorities

  ? Communication Routes

  ? Concentrator Response Time and Frequency Parameters

  ? Communication Parameters of the Concentrator

  ? Current Date and Time

  ? Other Concentrator Parameters

  ? Concentrator Software Version

  ? Records on Concentrator Parameter Changes and Adjustments

Reporting functions

? Reports with Analysis of Statuses and Alarms

? Reports on Electricity Quality

? Reports Related to Parameterization and Management

? Communication Reports

? Control Reports

? Reports Generated by the Concentrator

Data and Information Exchange with Other Information Systems and Subsystems of Electric Utility Robust protocol library for various types of DCUs and electronic energy meters, DLMS/COSEM, IEC61870-5-102 compliant
主站蜘蛛池模板: 石林| 建德市| 清流县| 布尔津县| 华宁县| 湘潭县| 富民县| 兴宁市| 翼城县| 剑河县| 策勒县| 芦溪县| 湟中县| 门源| 福建省| 重庆市| 商都县| 竹山县| 那曲县| 谢通门县| 台中市| 锡林浩特市| 松阳县| 揭西县| 信宜市| 监利县| 临城县| 曲麻莱县| 纳雍县| 涪陵区| 大洼县| 九龙城区| 汕尾市| 晋州市| 安宁市| 涡阳县| 视频| 通许县| 兰溪市| 阿克| 巴彦县|